SCHEDULING
AFG Group, Inc. (AFG) knows the importance of scheduling,
as it is a critical element of any successfully managed construction
project. Construction scheduling successfully manages and controls the
project’s time, and ultimately the budget. AFG offers the client a
complete range of scheduling from inception of the project to occupancy.
A construction schedule
should always reflect the actual sequence of work and be realistic. Actual
progress should be compared to the base-line schedule on a regular basis.
Techniques, such as short interval scheduling and critical path analysis,
can help avoid delays and make up lost time if necessary.
The three basic
elements of a project, Quality, Cost and Time should be consistent and
balanced with the owner’s goals in order to have a successful
project. Once the goals of the project are established the scheduling
becomes the means for managing the time component of the project.
During the
implementation phase it is essential to manage the project so that the
original project schedule is followed as closely as possible. In case of
delays, the schedule is usually used to determine if the delay can be
recouped. The evaluation should consider if the recovery plans impact the
cost or the quality of the project. The goal of the schedule is to keep a
close balance between Quality, Cost and Time.
Various tools during
the different phases of the project are utilized to assist in the
scheduling effort:
- Master Schedule
- Design Schedule
- Preliminary Construction
Schedule
- Master Construction
Schedule
- Initial Contract Schedule
- Contract Schedule
- As-Built Schedule
- Occupancy Schedule
|